News
- Details
On October 8th - 9th our expert’s group jointly with drilling team managing by foremen Mr. R.Valeyev & Mr. O. Sheshlyannikov provided whipstock services on well no. 1931, South Romashkinskoye oil field.
- Details
On September 30th our company together with drillers of Siberian Service Company has cut a window with hydraulic type whipstock in 6-5/8” casing in the well on North- Urengoy field.
- Details
Next window in 5-3/4” casing with application of hydraulic whipstock was provided by Drilling Innovation’s technologist in well no. 4136, Bureykinskoe field. The whipstock was landed at 3736 ft depth.
- Details
KLEN-HAS-5 hydraulic anchor type whipstock was set at 7874’ depth in 5-3/4” casing by Drilling Innovation’s experts in South Subbotinskoe oilfield. The orientation of the whipstock according to the project azimuth was done by MIG-42 gyro inclinometer.
Thanks to the professionalism and teamwork of drilling team managing by experienced foreman Chehanovsky N. all jobs were done without any complications.
- Details
Equipment for window cutting from Drilling Innovation works reliably at big depth
- Details
To eliminate the consequences of the accident at the well no. A9-3 Urengoyskoye oilfield our company has landed a whipstock at 12352 ft. (3765 m.) depth. Once again Drilling Innovation quickly helped the Customer in a critical situation.