To eliminate the consequences of the accident at the well no. A9-3 Urengoyskoye oilfield our company has landed a whipstock at 12352 ft. (3765 m.) depth. Once again Drilling Innovation quickly helped the Customer in a critical situation.

From order receipt till main work beginning was spent no more than 3 days, which included: preparation of equipment and its shipping to the Customer base in New Urengoy city (more than 2600 km from our base), arrival of our engineer - technologist. To the technologist’s arrival the preparation works for whipstock’s setting have been completed. Whipstock was oriented according the project azimuth by our small-sized telemetry system GNOM-1.