Next window in 6-5/8” casing with application of hydraulic whipstock was provided by Drilling Innovation’s technologist in well no. 23715, Berezovsky field.

The whipstock was landed at 4835 ft depth. The equipment’s quality and strict phased implementation of the work plan allowed to complete the job as soon as possible. There is no mill’s undergauge.

The Customer’s drilling team has not encounter any problems on running BHA for sidetracking.