On February 15th Drilling Innovation LLC set the whipstock in 6-5/8” production casing on well no. 1111 Khancheyskoye field, Yamal, West Siberia

After orientation by compact telemetry system the anchor was landed and shear bolt was cut on 22 Klb. The window was cut on 7959 – 7669’ and 21’ rat hole was drilled.

Proficiency and coordination of drilling team headed by Mr. Arkady Safronov allowed to do the job with high quality. Now the sidetracking is on the way