To solve the accident situation at the well of Samaraneftegaz (Rosneft oil company) our company have set the 9-5/8 whipstock at 10521 ft depth. Less than 24 hrs has passed from the order receipt till delivering the equipment and arriving the technologist to the well. Despite the complications with the uncased part of well (drilled with 8-1/2 bit), whipstock was run to the requested depth.

In early June, our company held a successful work of setting the hydraulic whipstock KLEN 9-5/8" anchor type fo an open hole in the well at Kuleshovsky oil field in Samara region for "Samaraneftegaz.

In the end of March and during the half of April 2014 Drilling Innovation LLC held a unique work to isolate a zone of total loss of drilling mud in the well No. 2SK in the West Kazakhstan region for Karpovskiy Severnyi LLP

One more window in the 5-3/4" casing was cut under the supervision of DI's specialists at the well 324 Muslyumovsky field.

One trip hydraulic type Whipstock KLEN- 5" was used for this well.

KLEN-HAS-5 hydraulic anchor type whipstock was set at 7185’ depth in 5-3/4” casing by Drilling Innovation’s experts in Vynngayakhinskoye oilfield. The orientation of the whipstock according to the project sighting angle was done by magnetic inclinometer.

In mid-March DI specialists have carried out work on the isolation zone of drilling mud in the well No.103 of the Olympic field.