-
Presentation in UAE,
2010
-
Presentation in Mexico,
2015
-
AOG Exhibition, 2013,
Argentina
-
In ADCO office,
UAE
-
In PedEx company office, 2015,
Iran
-
Services for orientation,
Irkutsk
- Services on Yamal
-
Meeting with Stockholm Precision Tool,
Spain, 2013
-
APOGE Exhibition, 2013,
Jakarta
-
Test jobs,
UAE
-
Services in Libya,
2010
-
Window cutting on shelf, 2013,
Indonesia
Integrated solutions in drilling
Our primary mission is to provide the Customers with a full range of engineering support for well construction with application of innovative technologies.
The company’s office is located in Oktyabrsky city, Republic of Bashkortostan, Russian Federation Go to contacts
News
- Detalles
Second job for the Customer from Uzbekistan. Cutting the window on well no. 31, South Kyzylbayrak field
After well construction in 2009 the Customer got the influx of oil with high content of water. After several attempts to solve this matter he decided to drill a lateral bore. As the Contractor our company was chosen.
- Detalles
April 26th, on well no. 96, Voinskoe field, Orenburg region with MBU - 125 mobile drilling rig the hydraulic type whipstock was set at 7598 ft. (2316 m.) depth . The orientation was done with GNOM-1 compact telemetry system. The shear bolts were released at 19.8 Klb load. It was taken 4.5 hrs to cut the window. Mill gage wear during cutting the window and rat hole during drilling is absent. The job was done for one trip.
- Detalles
In early April our company has provided the whipstock services for Siberian Service Company
- Detalles
In March our technologists conducted 4 whipstock jobs with application of hydraulic type whipstock with orientation. For Samaraneftegaz OJSC of Rosneft JSC - at 6234 ft depth in 5-3/4” casing in West - Kommunarovskiy field with application of gyroscopic inclinometer orientation and at 5840 ft depth in 5-3/4” casing in Evgenevskoe field with application of gyroscopic inclinometer orientation.
- Detalles
In the last days of February "Drilling Innovation" LLC set hydraulic type whipstock in 146 mm production casing at the well № 306-Belozero Chubovskoye field.