Presentation in UAE,
2010
Presentation in Mexico,
2015
AOG Exhibition, 2013,
Argentina
In ADCO office,
UAE
In PedEx company office, 2015,
Iran
Services for orientation,
Irkutsk
Services on Yamal
Meeting with Stockholm Precision Tool,
Spain, 2013
APOGE Exhibition, 2013,
Jakarta
Test jobs,
UAE
Services in Libya,
2010
Window cutting on shelf, 2013,
Indonesia

Integrated solutions in drilling

Our primary mission is to provide the Customers with a full range of engineering support for well construction with application of innovative technologies.

The company’s office is located in Oktyabrsky city, Republic of Bashkortostan, Russian Federation Go to contacts

The priority for our company has always been mutually beneficial cooperation and trusting relationships. Therefore, we are always working to improve the quality of materials and technologies, which allows us to remain in demand on the market today. So, one of the Partners, with whom we have been working for more than six years, again turned to us with an application for the manufacture of whipstock for cutting out a "window" in a 6-5/8" casing.

In late September, we shipped a couple of whipstock sets to our reliable Partners in Latin America. This time it was equipment for 11-7/8 and 13-3/8 casings.

Not a lot of work on cutting out windows is carried out annually in large size casings, such as 8-5/8", 9-5/8", 10-3/4" and 13-3/8". Our company is always ready, there is equipment in stock for all standard sizes of cazong and the company's engineer is always ready to help the customer in terms of preparing and agreeing a work plan in the event of an accident.

The hydraulic whipstock KLEN-HA 5-¾" was set by an engineer of Drilling innovation LLC in a 5-¾" casing at the customer's well in Orenburg region.

One more window cutting was carried out in the Yamalo-Nenets Autonomous Okrug by the specialists of Drilling Innovation LLC. The KLEN-7'' hydraulic whipstock was run and installed at a depth of 3100m in the well of the Urengoyskoye oil and gas field.

Over the past 1.5 years, the world has experienced many difficulties. These are all kinds of restrictions, lockdowns, prohibitions, and so on. We are all tired and want to quickly return to the usual rhythm of life. So, on July 16, we organized a meeting of employees and their families on the territory of the production base of LLC "Dynamic drilling technology".