From August 17 to 22, a geophysicist from Drilling Innovation was mobilized to the Customer’s site 500 km from the base and carried out work to orient the mechanical Whipstock for the 7" casing.
All work was carried out in the normal mode. The wedge was oriented without the slightest error of 60 degrees in true azimuth. Directional drilling of the sidetrack continues.





