Presentation in UAE,
2010
Presentation in Mexico,
2015
AOG Exhibition, 2013,
Argentina
In ADCO office,
UAE
In PedEx company office, 2015,
Iran
Services for orientation,
Irkutsk
Services on Yamal
India Energy Week in New Delhi,
India, 2025
APOGE Exhibition, 2013,
Jakarta
Test jobs,
UAE
Services in Libya,
2010
Window cutting on shelf, 2013,
Indonesia

Integrated solutions in drilling

Our primary mission is to provide the Customers with a full range of engineering support for well construction with application of innovative technologies.

The company’s office is located in Oktyabrsky city, Republic of Bashkortostan, Russian Federation Go to contacts

Launched well count was continued on in our native Tatarstan. Meter of fresh snowdrifts were not a problem to our technologist Irek Fattakhov to deliver equipment to the well in time. Our experienced technologist went to the well with our new marketing expert to forward his knowledge and skills and it gave him strength.

New Year is the family holiday which meets with family and old friends. However the drilling continues, despite the holidays. In this year such luck dropped to our technologist Aydar Shakirov. And it becomes a tradition in our company.

Western sanctions and Siberian frosts are not a barrier for Russian oilmen. Actively in process is development of gas fields in Far North. Around the gas capital of Russia - Novy Urengoy like mushrooms appear rigs. High rates of sidetrack wells construction. Our equipment as always is in demand.

Thanks to the coordinated job of the Drilling Innovation’s technologist and drilling team managed by foreman Mr. M. Kuvshinov the next window was cut on more than 10000 ft. depth in 5-3/4” casing, Kolganovskoe field (Orenburg region).

Unique work was undertaken by Drilling Innovation specialists outside of Russia with the application of profile liner. In this case the profile liner PL-168C was used to eliminate leaks in the 6-5/8" casing (168mm) at a depth of 785m.

Traditionally the Drilling Innovation meet and spend the holidays on the rig site. The last weekends and holidays was not exception.