-
-
Presentation in UAE,
2010
-
-
Presentation in Mexico,
2015
-
-
AOG Exhibition, 2013,
Argentina
-
-
In ADCO office,
UAE
-
-
In PedEx company office, 2015,
Iran
-
-
Services for orientation,
Irkutsk
-
- Services on Yamal
-
-
India Energy Week in New Delhi,
India, 2025
-
-
APOGE Exhibition, 2013,
Jakarta
-
-
Test jobs,
UAE
-
-
Services in Libya,
2010
-
-
Window cutting on shelf, 2013,
Indonesia
Integrated solutions in drilling
Our primary mission is to provide the Customers with a full range of engineering support for well construction with application of innovative technologies.
The company’s office is located in Oktyabrsky city, Republic of Bashkortostan, Russian Federation Go to contacts
News
- Detalles
On September 12th in honor of the Whipstockman’s Day for our employees was organized the field trips. We played different kind of games: football, volleyball and paintball. The trip was completed by around the campfire songs with a guitar. Full of impressions and pretty tired, we returned home.
- Detalles
Regular kickoff made Drilling Innovation company in August. One of such job was made of applying a hydraulic whipstock KLEN 5 ¾ for window cutting process in 5 ¾ casing on Vyngayakhinskoye field.
- Detalles
To solve the accident situation at the well of Samaraneftegaz (Rosneft oil company) our company have set the 9-5/8 whipstock at 10521 ft depth. Less than 24 hrs has passed from the order receipt till delivering the equipment and arriving the technologist to the well. Despite the complications with the uncased part of well (drilled with 8-1/2 bit), whipstock was run to the requested depth.
- Detalles
In early June, our company held a successful work of setting the hydraulic whipstock KLEN 9-5/8" anchor type fo an open hole in the well at Kuleshovsky oil field in Samara region for "Samaraneftegaz.
- Detalles
In the end of March and during the half of April 2014 Drilling Innovation LLC held a unique work to isolate a zone of total loss of drilling mud in the well No. 2SK in the West Kazakhstan region for Karpovskiy Severnyi LLP
- Detalles
One more window in the 5-3/4" casing was cut under the supervision of DI's specialists at the well 324 Muslyumovsky field.
One trip hydraulic type Whipstock KLEN- 5" was used for this well.

