From 21st to 25th of October experts of Drilling Innovation with the drilling crew managed by Mr. G. Vafin provided whipstock services on well no. 21337, North Almetyevsky field.

This work was little different from the standard cuttings. Zenith angle at landing’s depth was 83 º. Orientation was provided by telemetry system. After this successful part of job the anchoring was done, shear bolts was cut and the BHA was pulled out of the hole. With second trip was provided cutting the window in 6-5/8” casing for 10 hrs. Milling the window was done with application of top drive and Uni Drill mud system. There is no mill’s undergage.

At the present the 5-5/8’ drilling of lateral bore was done with BHA from Halliburton