From August 17 to 22, a geophysicist from Drilling Innovation was mobilized to the Customer’s site 500 km from the base and carried out work to orient the mechanical Whipstock for the 7" casing.

In the last ten days of July, DI engineer carried out operations to assemble and set of whipstock with a hydraulic anchor in a 7" casing.

The hydraulic anchor allows to set an equipment at any depth of the wellbore, without requiring additional costs for the installation of cement bridges or packer plugs.

Drilling innovation LLC is a regular participant in international exhibitions and forums.

In the period May-June 2025, the company's specialists toured the countries of Southeast Asia and took part in a number of exhibitions, forums and presentations of their own equipment and technologies to potential world-class Customers.

During February, our company's engineers worked at several sites in various regions of the Russian Federation.

Work was carried out to cut technological windows 5-3/4'' and 6-5/8'' casings

In January 2025, DI specialists carried out work to cut a window through 2 casings.

Under the patronage of the Ministry of Petroleum and Natural Gas and the support of the Federation of Indian Petroleum Industry, India Energy Week was held in New Delhi from 11 to 14 February 2025. The event has become a new meeting place for energy professionals, where deals worth millions of dollars are being struck.

In January 2025, Drilling Innovation specialists carried out work to cut a window through 2 casings.

Hydraulic type Whipstock KLEN-HA 7’’ was set at a depth of 3115 m in a 7'' casing. Orientation was carried out using a small-sized gyroscopic inclinometer by an DI engineer-technologist.