On August 11th , 2009 Drilling Innovation cut the another window in the well no. 129 (well cluster no. 142 Priobskoye oilfield) for Siberian Service Company Close Corporation. The window in 6.614” casing was cut at 8530’ depth.

The significant event happened in the beginning of August. Our company concluded a contract with Quipco Al Shoumoukh LLC (United Arab Emirates) on the production of hydraulic packer as part of our whipstock. This company develops and manufactures the downhole tools, subs, kelly, fishing tools, as well as repair of drill pipes. The equipment meets the stringent requirements of API standards.