One more window in the 5-3/4" casing was cut under the supervision of DI's specialists at the well 324 Muslyumovsky field.

One trip hydraulic type Whipstock KLEN- 5" was used for this well.

The orientation of Whipstock was provided by Gyro tool (Gyro Tracer Directional). Accumulated a long experience of joint work DI LLC and MUN TECHNOLOGY LLC played an important role.

For the whole job from the moment of P/U and M/U the whipstock assembly to POOH of milling BHA after cutting window process & lay it down were spent 15.5 hours. The drilling BHA pass through the window without any problems. The Customer is continuing the drilling of lateral bore at present time.